Another Little Update

I realized it’s been two weeks since I’ve done an update on the progress of the house, so here’s the latest.  Almost all of the exterior doors and windows are in and the natural gas lines are done.

GreatRmNotice how the windows in the nook are shorter than the family room and the extra framing they had to add to correct the hole size they originally framed?  Well this is what it looks like on the outside.  I’m not super keen on this little change and will certainly be watching to make sure it looks better than this when we do our walk through!  I’ve also questioned why one window opens and the other doesn’t.  Seems they should both be one or the other.

ExteriorPatch

Laundry   Studio
Laundry room and Studio

HallBath Master
Hall Bathroom and Master Bedroom

MasterBathMaster Bathroom

GarageThe little window in the garage.  I’m not sure of it’s purpose, since it doesn’t let in much light…escape hatch perhaps? LOL

The highlight of the recent progress is our front door being installed!  In the design we liked and asked for!  Here it is from inside with the framed entry way and outside where the covered front porch will be.  Below is a wide shot of the front entry from outside.  Can’t wait to see this bad boy painted purple!

FrontDoorInside   FrontDoorOutsideCloseup

FrontDoorOutside

Apparently, there was a delay with the roofing contractor and electrician because we were told those items would happen this week, but there was no sign of either being started yet.  Instead there was limited progress on the vented soffets and trim around the windows and corners on the front of the house.

Soffett

WindowTrim

There was also a pile of materials to begin the lap board siding on the front of the house and our back deck!  We’ve got big plans for the back yard so watch for a post about that later this week!

Materials