DIY Glass Insulator Pendant Lights

We knew we wanted something unique for the pendant lights over the bar in the kitchen, but weren’t sure exactly what that might be.  I spotted this idea on Pinterest and immediately loved it.  Surprisingly, so did the hubs who took me to an antique store he’d just discovered to pick out insulators for our project a few days later.

We also acquired some heirloom insulators from the hubby’s Aunt in Colorado during our road trip in September, so we had quite a selection to choose from.  I set them all out and tried different combinations to decide which we liked best.

We hadn’t given the project much more thought since then as we were busy with other details and the house wasn’t ready for light fixtures just yet.  But now that it is, we suddenly had to figure out how to make it happen and choose exactly which insulators to use.

Option1

Option2

Option3

And finally decided this was just right.

Winner

My handy dandy hubs found the right bit and snuck in time on a drill press at work to drill the holes.  The first four drilled without a hitch, but then while drilling the last one it cracked!

1

2

Crack

We had a few others in the same color and size, but they all had pretty big chips, so that wonderful hubby of mine made another trip to the antique store and picked up two more for $9 each.  He drilled both without a problem, but one did develop an internal crack.  We decided to still use it since it added character, and that left us a spare in case any ever did meet an untimely fate and require being replaced.

We followed the tutorial from Pinterest and purchased the same materials to retrofit the pendant cords the builder installed.

Supplies

It took a little trial and error to figure out the best method for removing the parts we didn’t need and reusing the parts we did, but the hubs made it happen – even though he was super tired!

Work
Notice that mess on the counter? That’s how the rest of the house looks too.. I think I have hives.. LOL

Work2

It also took a bit of adjusting to get them all at the same height, but they look awesome!

Finish2

The builder thought we were nuts when we showed him what we were planning, and all he had to say when he saw the finished product was “It’s different.  I’ve never seen that before.”  But at this point, if it’s something he doesn’t have to do, he’s game.

The LED bulbs don’t put out much light at 0.6 wt, but the recess lighting in the main area of the kitchen supply plenty of light to cook by.  They do make a nice ‘night light’ when on by themselves, so that’s probably how we’ll use them the most.  We will be on the lookout for brighter bulbs that will fit, but for now these it the bill.

Finish

I just adore the finished result.  Not only are they unique and repurposing something that is otherwise unused, but they bring a piece of family history to our new home.

Have you ever used old glass insulators for projects?  If so, please share!  We still have several and need some ideas.

Shared at Knick of Time’s Vintage Inspiration Party #203!

Advertisement

The Finishing Touches

It’s been a very busy few days at the new house!  We’ve finished the flooring – after several very long nights.

FloorStudio

FloorEntry

FloorBathroom

FloorGuest

The counter tops are finished and look fantastic.

Counters2

Counters

The tile in the master bathroom has been installed, grouted and sealed.

TileTub

TileShwr

TileShowerFloor

The stone work on the fireplace is up, although it needs to be grouted.  The stone on the front porch still needs to be started.

Fireplace

The appliances have been delivered and are being installed. I can’t wait to use all the space in this fridge!!

Fridge

FridgeDoor

FridgeInside

The electrical fixtures (switches and outlets) are almost complete and the baseboard trim has been installed and touch up filler/paint is in progress.

TrimFamilyRm

I was worried I might second guess some of the lighting selections, but everything I’ve seen so far looks great.

LightFixtures

LightDining

LightEntry

LightHallway

LightGuest

LightMaster

LightFartFan

LightLaundry

The prop fan we selected for the family room is on order, so a ‘temporary’ fan was installed for the appraisal.

LIghtTemp

The builder is now back on-site and doing what he can to keep everything on schedule for closing on December 1.  Our movers are scheduled for December 4-6, since they believe it will take a day to pack up our stuff, a day to load the truck and a day to deliver.  It seems so close and yet so far away.

Unfortunately, all this progress tends to create a trail an explosion of tools and supplies throughout the house.  Every time, I’m there and see the mass of stuff everywhere I twitch unintentionally.  But I know it means I’m closer to living in our new home, so I’m working my way through it with deep breaths – which seem to worry my husband more and more. 🙂

Explosion
And this was a “super clean” day!

The appraisal was supposed to be done today, but might have to be finalized next week once everything is at 100%.  The energy rating will be done soon and our home inspection is set for Saturday.  We’ve also locked in our interest rate for our loan.  If for some reason the paperwork causes a delay, the builder has agreed to do an early occupancy without rent to accommodate our scheduled movers and time off from work.

Other than making sure all the elements are finished, all that’s left will be cleaning and finding a new renter for our current place!  Our landlord had someone lined up, but hasn’t gotten confirmation just yet, so we’re hopeful that will work out.  Stay tuned for posts on more of the details!